Jump to content
Contact

11-Point Software Architecture Checklist (Nothing Left Out)

Eleven yes-or-no checks that cover structure, data, deployment, security and recovery, with the evidence to ask for behind every answer.

Whitney Sorensen, Head of Software Content at Umber SoftwareBy Whitney Sorensen
Head of Software Content
Reviewed by Priya Raman, Lead Software Architect Updated Verified

Main Points

  • Eleven checks cover structure, data, integrations, delivery, security, recovery and ownership.
  • Answer each with evidence, such as a link, a date or a number.
  • Failed checks are ranked by what they cost you now, not by how untidy they look.
  • Run the list twice a year and before every large change.

A checklist cannot design your system, but it stops you from forgetting the dull things that cause the worst surprises. I use this one at the start of every architecture consulting engagement, and teams can run it themselves in an afternoon.

The eleven checks are grouped by theme. Each has a question, the evidence you should be able to show and a typical failure I see in practice. Work through them with two or three engineers and compare answers at the end.

The Checklist in One Table

#CheckEvidence to ask for
1Current-state diagram that the team agrees is accurateDiagram with a date and a named owner
2Module boundaries enforced, with no dependency cyclesDependency report from the build
3One owner for every data setOwnership list by table or collection
4Every external integration has timeout, retry and alertIntegration inventory with settings
5Releases are automated and reversiblePipeline link and last rollback date
6Logs, metrics and traces answer "what is broken?" in minutesTime to detect in the last incident
7Access is least-privilege and secrets sit in a vaultAccess review from this quarter
8Dependencies and runtimes are supported and patchedScan result with end-of-support dates
9Load limits are known and testedLatest load test report
10Backups are restored on a scheduleDate and result of last restore
11No part depends on a single person's knowledgeBackup owner named per component

Checks 1 to 3: Structure and Data

Start with the picture. If the team cannot agree on a diagram of the current system, nothing else on the list can be answered with confidence. I have seen two senior engineers draw the same system with different numbers of services. The disagreement was the first finding.

Check two asks whether boundaries are real. A boundary written in a document and ignored in the code is not a boundary. Tools that read the codebase can list cycles in minutes, and the count of cycles is a useful number to track over time. A software architecture framework gives you a layered model for deciding where those boundaries belong.

Check three covers data. Ask who is allowed to change each table. When the answer is "everyone", schema changes become negotiations, and every release carries a risk nobody can measure.

Comparison of tables written by many services against tables with a single owner, showing how ownership affects schema changes and bugs.
Check three passes only when every table has one clear writer.

Checks 4 to 6: Integrations, Delivery and Visibility

Integrations are where systems meet the outside world, and where most incidents start. List every external call with its timeout, retry rule and alert. The inventory alone often reveals calls with no timeout at all, which can hang a whole request path when a partner slows down.

Check five looks at how code reaches production. The question is not whether you have a pipeline, but whether you would press the button on a Friday afternoon. If a rollback has never been rehearsed, answer no.

Check six measures visibility. Take your last incident and ask how long it took from the first symptom to the team knowing which component failed. If the answer is hours, your logging and tracing are weak, whatever the dashboards look like. Weak visibility makes every other problem more expensive.

Four step path an incident follows from a customer symptom to its root cause when logs, metrics and traces are in place.
Check six asks how long this path takes in your last real incident.

Checks 7 to 9: Security, Support and Load

Access control and secrets are architecture decisions because they cut across every component. Ask for last quarter's access review and look for accounts that should have been removed. Search the repository and configuration for credentials. Finding one is common, and fixing it is cheap if you find it first.

Check eight covers supported software. A runtime or framework past its end-of-support date accumulates risk quietly, because fixes stop and scanners start to flag it. Keep a short table of every runtime, its version and its support end date. When the date is within a year, put the upgrade on the plan.

Timeline of a runtime support lifecycle from full vendor support to the end of patches, showing when running risk starts to rise.
Plan the upgrade while support is still in the late phase, not after it ends.

Check nine asks whether you know your limits. A system that has never been pushed has an unknown ceiling. A simple load test at two times your normal peak finds the first bottleneck, and it is almost always a database query or a single-threaded batch job.

Checks 10 and 11: Recovery and People

A backup you have never restored is a hope, not a backup. Schedule a restore test at least twice a year, time it and write down what broke. I have watched a team discover during a real incident that their backups had been empty for four months. The restore test would have caught it in a day.

The last check is about people. If one developer is the only one who can deploy, tune or explain a critical component, you have a single point of failure that no diagram shows. Name a second person for every key part and have them do a task alone once. Knowledge spread is cheaper than a crisis.

A Worked Run: A Mid-Sized Order System

To show how the list behaves, here is a run on a typical client system: an order platform, about nine years old, maintained by seven developers. The team filled in the checklist alone first, then together. The first round produced eight passes. After evidence was attached, three of those became partial.

Check two slipped first. The team believed modules were separate, yet the dependency report showed fourteen cycles, most through one shared "common" package. Check four followed: of twenty-three external calls, nine had no timeout. Check ten was the surprise. Backups ran every night, but nobody had restored one since a migration two years earlier, and the restore script pointed at a server that no longer existed.

The fixes were small. Timeouts and alerts took one developer four days. A restore test took a day and a half, including repairing the script. The cycles became a standing item: each sprint, the team removed the cycles in the module it was already changing. Within three months the count fell from fourteen to five, with no dedicated project.

Two lessons repeat across systems. First, self-reported passes are usually optimistic until evidence is attached. Second, the failures that matter are rarely the ones that look untidy. The ugly module with no tests ran fine for years. The tidy backup job was the real risk.

What a Passed Checklist Still Misses

A clean sheet does not mean your architecture fits your plans. The checklist is generic by design. It tells you the basics are covered, and says nothing about whether the structure suits a tenfold increase in users or a second product line. Those questions need a target, which is what an assessment adds.

The list also ignores cost. A design can pass every check and still run on infrastructure that costs twice what it should. Add a twelfth line of your own for spend, if cost matters to you, and review it with the same evidence rule. Finally, the checklist cannot judge fit between structure and team. Five teams working in one module will collide no matter how clean it is, and only conversation with the people involved shows that.

Scoring and Acting on the Results

Mark each check as pass, partial or fail, and attach the evidence. Do not turn it into a percentage. Ten passes and one failed restore test is not a ninety percent system. It is a system that may not survive its worst day.

Then rank failures by cost. Estimate what each gap costs you now in hours, incidents or risk, and what fixing it costs. Fix the cheap, costly gaps first. Move the expensive, low-cost gaps to the watch list, with an owner. For a pattern-by-pattern view of what good looks like, my software architecture best practices article pairs each practice with a mistake to avoid.

Matrix for ranking failed checklist items by fix effort and the cost of leaving the gap open, from do first to defer.
Rank failures by what they cost you now so the cheap, costly gaps go first.

If several checks fail in the same area, a full architecture assessment is the right next step, because it ties the findings to a specific change. Tools can automate some of the checks, such as dependency reports and scans. The software architecture tools comparison lists the ones I rely on.

A last practical note: keep the filled-in checklist. Dated copies show how the system changes over time, and they give a new architect or an auditor a fast starting point. When the same check fails twice in a row, it stops being a gap and becomes a pattern, and patterns deserve a project of their own with a budget and an owner. I also suggest posting the failed checks where the whole team can see them, since shared visibility does more for follow-through than any status meeting.

How to Choose Who Runs the Checklist

For a first pass, the team itself is fine. Ask each person to answer alone, then compare. The gap between answers is the signal. Add an outside reviewer when:

  • The team has changed little in years and may not see its own habits.
  • A buyer, auditor or investor needs an independent view.
  • Answers differ widely and the team cannot settle them with evidence.

Whoever runs it, insist on evidence. The value of the list is that it replaces "I think so" with a link.

Checklist of five pieces of evidence to request from whoever claims a pass, from a dated diagram to a recent access review.
Insist on the artifact itself, because a self reported pass is usually optimistic.

Questions About the Software Architecture Checklist

How Often Should I Run Through This Checklist?

Twice a year for a stable system, and before any large change such as a migration, a new product line or a major hire. After a serious outage, rerun the points that relate to the failure while the details are fresh. A checklist you use regularly stays short, because you keep removing what no longer applies.

What If We Fail Several Points?

Most systems do. Rank the failed points by what each one costs you today, then fix the top two or three. A failed point without a cost is a candidate for an accepted risk, written down with a name next to it.

Is a Checklist Enough, or Do I Need a Full Assessment?

A checklist finds gaps quickly and costs an afternoon. It does not tell you how serious a gap is for your plans. When several points fail, or the stakes are high, follow up with a full assessment against a specific change.

Who Should Fill in the Checklist?

Two or three engineers who work in the system every week, filling it in separately first. Compare answers afterward. The points where people disagree are often the most useful result, because they show where the architecture is not clearly understood.

Does This Checklist Work for a System Built on a Low-Code Platform?

Most points still apply, especially data ownership, integrations, access control and recovery. A few, such as dependency direction in code, need translating to the platform's own structure. Where the platform limits your choices, note the limit as a known risk.

How Is an Architecture Checklist Different from a Code Review Checklist?

A code review checklist looks at a single change: naming, tests, error handling. An architecture checklist looks at the whole system's structure, data, deployment and operations. You need both, and they catch different problems.

What Evidence Should I Attach to Each Answer?

A link or a number. For example, a link to the pipeline for release automation, or the date of the last restore test for backups. An answer of yes without evidence is an opinion, and opinions are what a checklist is meant to replace.

Please note: this guide is general information and not legal, financial or tax advice. Numbers and examples are typical-project estimates; confirm current details with your providers and advisers.

Did this article help you?

Whitney Sorensen, Head of Software Content at Umber Software

Whitney Sorensen

Head of Software Content, Umber Software

Whitney leads the Umber editorial team and works with the consultants to turn real client projects into practical guides on software selection, custom development, integration and legacy modernization. Before joining Umber, she spent years writing and editing for engineering and IT teams. She has since reviewed architecture audits, system selections and modernization plans from client projects across industries from manufacturing to healthcare. She works remotely from the USA.

Schedule a Free Consultation

Get Your Free Discovery Call

Enter your name.
That email address looks incomplete.
Add a short subject.
Tell us in a sentence or two what you need.